Operate and monitor yield
Performance Ratio and Availability tracked through the inverter manufacturer's platform (Huawei FusionSolar) plus the monthly report we produce — alarms raised before production is lost.
35.55 MW21 sites5 regions
OMIR 366 delivers full-scope Operation, Maintenance, Improvement and Repowering for commercial and industrial (C&I) solar plants — scheduled maintenance, performance monitoring and OEM warranty claim management under one contract.
Reply within one business day · Free site assessment before quoting
From 200 kWp rooftop systems to plants above 5 MWp — one team, one standard of documentation.
We do not sell panel washing. We run the full asset lifecycle — from steady-state operation to adding capacity at an existing site.
Performance Ratio and Availability tracked through the inverter manufacturer's platform (Huawei FusionSolar) plus the monthly report we produce — alarms raised before production is lost.
Scheduled PM plus corrective response, carried out by our own technicians and calibrated instruments — no waiting on third parties.
DC insulation testing, I-V curve tracing, thermal imaging and contact-resistance measurement — finding losses you cannot see.
Assessing existing space and equipment to add capacity or replace inverters without discarding what still works.
Every site visit ends with a document, not a phone call. Clients can open the record of any month, any site.
Sent in advance for site access approval.
Technicians with their own instruments, following the safety procedure.
String voltages, RPE/IR insulation, thermal images, before/after photos.
Work done, values measured, defects found, recommended actions.
Confirmed in writing by email or document — the job closes with a status.
Every incident is graded and owned — from an incomplete report to a plant that has stopped producing.
| Level | Condition | Owner | Notify within |
|---|---|---|---|
| Level 1 | Work off-plan · incomplete report · alarm requiring action | Maintenance engineer | 24 hrs |
| Level 2 | Instrument or manpower shortage · work stalled | O&M Supervisor | 8 hrs |
| Level 3 | Generation affected · unit offline | O&M Manager | 4 hrs |
| Level 4 | Severe · plant stopped · major production impact | Director / authorised person | immediately |
Testing follows the method of IEC 62446-1 (PV system testing), IEC TS 63019 (availability) and IEC 61724 (performance monitoring) — a reference to practice, not a system certification. We provide the instrument model and calibration date before every site visit.
From 200 kWp factory rooftops to multi-megawatt ground-mount plants — delivered by one team to one standard.
Illustrative photography — site photos will be published once each owner gives permission.
* Industry and capacity shown. Client names are published only with written permission, case by case.
Every visit leaves measured values, photographic proof and a report the client can reopen years later. No job ends without a record.
Four levels, from 24 hours to immediate, each with a named owner — not “available around the clock”.
1500 VDC insulation tester, 5 kV insulation meter, micro-ohmmeter and thermal camera — no dependency on subcontractors.
Tell us the system size and what remains of your current contract. We will assess the site and recommend what actually needs doing — no obligation, no upselling.